Past Deadlines can be found [[Beobot_2.0/Past_Deadlines |here]].
==== Critical Matters ====
* **Camera mount**: multiple camera rig, pan-tilt, single but heavy camera.
==== Others Non Critical Matters ====
* Sensors rack renovation to add new devices such as a robot arm.
* cooling control board box
* Firewall:
rubber seal for cooling bridge
* Front lights
8020 and aluminum plate
How to lock
Holes for expansion
==== Fixed bug ====
4/16/2010 Fix leak at swivel water connecter. New replaced O-ring 9.8mm ID 1.9mm width McMaster#93125K27