Past Deadlines can be found here.

Critical Matters

  • Camera mount: multiple camera rig, pan-tilt, single but heavy camera.

Others Non Critical Matters

  • Sensors rack renovation to add new devices such as a robot arm.
  • cooling control board box
  • Firewall:
    rubber seal for cooling bridge
  • Front lights
    8020 and aluminum plate
    How to lock 
    Holes for expansion

Fixed bug

4/16/2010 Fix leak at swivel water connecter. New replaced O-ring 9.8mm ID 1.9mm width McMaster#93125K27


Navigation
QR Code
QR Code beobot_2.0_mechanical_to_do_list (generated for current page)